A photo history of the rebuilding the Good Ship Lusty to better than new.

First few photos are current photos.

The following are starting from the storage yard and on


Hardtop1.jpg - 102257 BytesOct 20, 2006

Hardtop12.jpg - 163884 BytesOct 20, 2006
hardtop11.jpg - 152582 Bytes
The new hard top has temporary struts in the aft for now The aft supports have ladders built in for access to the top of the hard top. The overhead will be closed after the wiring is installed.
The control pedestal is fabricated but we will not install till the interior is close to complete.

If you look ahead you can see the Pacific ocean.

hardtop22.jpg - 160556 Bytes
If you look aft, you can see the storage yard next door..
October 2003 Lusty leaving her home for several years in a Newport Beach storage yard.

Moving to her new location in the parking lot at BioMagic in Costa Mesa for re work

on trailorsm2.jpg - 67701 Bytes
Getting ready to go on the trailer
on trailorsm.jpg - 33820 Bytes
Positioning the trailer
move10.jpg - 238784 Bytes
The front of the cradle on the roller car
move12.jpg - 221561 Bytes
Putting the roller blocks on the rear of the cradle
move16.jpg - 245275 Bytes
The truck backing the trailer under the cradle.
Because of the limited room to maneuver the truck,
the cradle was moved onto the trailer with the chain Cum-A-longs
move18.jpg - 233007 Bytes
All loaded and read to tie the cradle to the trailer
move20.jpg - 203003 Bytes
Going out of the OLD YARD and heading for the new location
move22.jpg - 179263 Bytes
Backing the rig into the new location at the BioMagic factory
move31.jpg - 203003 Bytes
Backing into the yard
move30.jpg - 179263 Bytes
Lusty in her new temporary home
lusty55.jpg - 222833 Bytes
The Good Ship Lusty in construction
in the BioMagic parking lot
newshaftalley1.jpg - 39570 Bytes
2004 Work is started on the new shaft log
newshaftalley2.jpg - 182432 Bytes
The new shaft log
july192004sm.jpg - 16004 Bytes
Shaft log in construction
july1920042.jpg - 21645 Bytes
Shaft log in construction
shaftlog1.jpg - 23420 Bytes
New finished shaft log with gel coat and PVA
newprop1.jpg - 102510 Bytes
The new prop amd shaft
are in and works great
newproop2.jpg - 113298 Bytes
Another view of the prop
2006 BOAT PHOTOS
boat 111.jpg - 115775 Bytes
The deck has new gel coat and windows,
new ports, hatches, toe rail, safety
railing and ventilation
engine room no floor.jpg - 157238 Bytes
February 2006 The engine room is gel
coated and is now ready for the
generator and engine.
Oh we will put the sole down also..
The green stuff is PVA to kick the jell off..
newjel1.jpg - 113807 Bytes
Fresh and spotless new off white gel.
bottongel.jpg - 127901 Bytes
The bottom is done except for the keel
keelalmostfinishedsm.jpg - 169161 Bytes
The keel is done
Boat 111.jpg - 115775 Bytes
Better view of the boat
deck.jpg - 126049 Bytes
Looking forward
hatch.jpg - 110405 Bytes
New hatch. The lower part nest into the top part
hatch2.jpg - 108803 Bytes
The hatch opened
1paul pedistalsm.jpg - 111126 Bytes
New pedestal Has to be gel coated and finished
2sandblastingenginesm.jpg - 98759 Bytes
Sand blasting engine to get ready for paint
3primingenginesm.jpg - 119449 Bytes
Priming the engine
4paintedenginesm.jpg - 67922 Bytes
The White (Not Alpine green) 4-53 Detroit
windshield4.jpg - 149355 Bytes
The new wind shield frame
generator1.jpg - 159482 Bytes
Shorty guides the generator down the hatch
view1.jpg - 193728 Bytes
The wind shield is in place. Hard top is next
hardtop2.jpg - 179414 Bytes
The new hard top setting on the mold. The ribs are to add strength without pounds of fiberglass
hardtop3.jpg - 176865 Bytes
Mike is putting the foam ribs in place
hardtop4.jpg - 172589 Bytes
Mike, our very own boat monkey
ref-frz2.jpg - 188476 Bytes
The new ICE A BOX and Freezer below
dingy22.jpg - 69421 Bytes
Lusty's new dingy
newdingyside.jpg - 207846 Bytes
Another shot of the dingy